3.Project challenge or difficulty
3.1. The project includes the selection of various measuring instruments and the integration of communication;
3.2. Coordinate with stakeholders on installation and construction of various instruments on site;
3.3. The installation time of the project is urgent, which needs very reasonable and fine planning
3.4. Safety risk of gas pipeline reconstruction
3.5. Customization requirements of system functions
4.Solution
In this project, our company provides Acrel-5000 energy consumption management system. The whole system adopts ring network structure, and realizes dual machine thermal redundancy design from the acquisition layer, transmission layer and management layer. It can realize the internal display of the workshop and upload the data to the plant energy management platform.
Comprehensive energy consumption display: it reflects the comprehensive energy consumption of each category of energy consumption of the workshop in the current year and converted into standard coal,
Energy consumption comparison: reflect the energy consumption and comparison, growth percentage and added value of a certain category of energy consumption on the same day and the same period of yesterday, the same period of current month and last month, the same period of current year and last year;
Display mode: the daily, monthly, weekly, quarterly and annual energy consumption of branch road can be counted, and the statistical data can be displayed by bar chart, point line chart, accumulation chart, pie chart and other charts;